One lane closed at the foot of the ghat was leading to the huge backup.
Bhpian vigsom recently shared this with other enthusiasts:
Status as of 45 mins back
I had to do a trip to Salem early today and avoided driving, because of another driver’s input. Happy I didn’t drive. Expect at least 45mins delay between Thoppur Toll Plaza and the end of the incline because of some road works going on at the foot of the ghat – one lane closed. Guess where the backup is till? As soon as you pass the Thoppur Toll Plaza after paying a fat fee. I expect this to be the new normal for the near future until the roadworks is done.
Red all the way till the top
Traffic traffic traffic
One lane closed at the foot of the ghat – leading to the huge backup
Read BHPian comments for more insights and information.